BIM Roles and Responsibilities of the entire team when working in an IPD Environment.  Explaining how the different team members are utilized efficiently both from a design/engineering standpoint as well as a trade contractor.  Incorporation of the Trace Contractors shop drawings into the design/permit set to reduce design time and construction.

Files Included

[file] BIM 2010: Assigning Team Roles and ResponsibilitiesAdobe PDF22.96 MB

Attached To

 
Your price $25.00
Members save $5.00
Added:
9/28/2010
Updated:
10/28/2010